① Some time is required to start the operation as time is needed to supply water when the unit is operated when there is no water in the base unit tank component, such as when the unit is used for the first time or after the base unit has been cleaned.
(It may take about 10 minutes if the water level in the tank is low.)
The same is true when restarting operations with low water level in the water tank component, such as when the water is supplied in response to the notification to supply water (the Lower Level indicator flashes in red).
② Increase the amount of water poured in the tank to shorten the time needed for starting operation.
(It takes about one minute when the water level in the tank is full.)